ICRI Specification Compliance

Zero-delamination engineering through rigorous mechanical profiling

Every high-performance epoxy and polyaspartic installation is bound to strict ASTM and ICRI standards, eliminating substrate failure under continuous forklift and chemical traffic.

CSP 3-5

Surface Profile Target

>400 PSI

Tensile Bond Strength

100%

Elcometer Verification

Execution Protocol

Four-step installation sequence

01
02
03
04

Shot-blast profiling

Moisture mitigation

Broadcast build matrix

Topcoat seal

Mechanical surface preparation via abrasive blast equipment to achieve nominal CSP 3 to 5 anchor profile, removing laitance and weak concrete paste.

In-situ relative humidity and calcium chloride testing to verify vapor emission levels before epoxy primer anchoring.

Rapid-cure polyaspartic or chemical-resistant urethane topcoat application ensuring 24-hour return to heavy industrial service.

Multi-layer aggregate broadcast and high-build epoxy or polyurea layering to achieve specified mil-thickness ratings.

Quality Assurance

On-site verification metrics

6,000+

PSI Concrete Minimum

3.0 mm

Nominal System Thickness

24 HR

Full Chemical Cure

Schedule an on-site concrete core moisture test

Our technical team deploys directly to Michigan facilities to execute pull-tests and relative humidity assessments before bidding.